Disaster Vulnerability Reduction Project – East Coast Road Works
The Disaster Vulnerability Reduction Project (DVRP) has begun the Pre-Engineering and Design Services for east coast road works.
The DVRP in collaboration with the Ministry of Public Works will repair 43.3km of road from Pond Casse Roundabout to Castle Bruce and Castle Bruce to Hatton Garden and Petite Soufriere respectively.
The designs for the road will cost in excess of US$ 1 million dollars. Liason Officer in the Ministry of Health Dr. Martin Christmas said that the designs of the road will meet the highest level of resilience.
The execution period of the contract is approximately 11 months.